Pages
HOME
PLAN PELABURAN
TESTIMONY
CARA MENYERTAI
LOCATION
SOME OF JUGAN PILOT PLANT BATCH #2’S KEY COMPONENT & EQUIPMENT-19-7-2024-2
SOME OF JUGAN PILOT PLANT BATCH #2’S KEY COMPONENT & EQUIPMENT-19-7-2024-1
Geos Charles & Mark looking at hostoric Jugan core. 2022-03-08
Rig#1 core barrel recovery JUDDH97 2022-03-07
Retrieving core 2022-03-07
Rig#1 JUDDH97 2022-03-07
JUDDH94 samples loaded at BAu Core Shed. 2022-03-01
Core Photography 2022-02-25
CP Kev J. Wright JUDDH94 2022-02-23
247.7m JUDDH94 2022-02-23
241.7m JUDDH94 2022-02-23
JUDDG94 2022-02-23
Core Inspection, Nate 2022-02-23
Nate Core inspection 2022-02-23
Nate field quick log core JUDDH94 2022-02-23
Clearing bush Pejiru 2022-01-24
Drillhole location Pejiru 2022-01-24
Setting up drill hole locations Pejiru 2022-01-24
Pejiru drill pads 2022-01-24
Access Pejiru 2022-01-24
Pejiru access 2022-01-24
Drill Pads Pejiru 2022-01-24
Main road & Pejiru access 2022-01-24
Rig#1 driller keeps log2022-01-23
Rig#1 core barrel recovery 2022-01-23
NBG Drill Log Monitoring 2022-01-23
Core Barrel 2022-01-23
Geo quick field logging core. Rig#2 2022-01-23
Rig#1 2022-01-23
Rig#2 2022-01-23
JUDDH91 Geologist checks drill azimuth and dip. 15 Jan 2022
JUDDH89 15 Jan 2022
New Rig #1 pulling rods on JUDDH89 15 Jan 2022
Drill Rig#2 sets up on JUDDH91 15 Jan 2022
Background Rig#1 driling JUDDH89. Foreground Rig #2 sets up on JUDDH91 15 Jan 2022
Setting up Rig#2 on JUDDH91 15 Jan 2022
Core Delivery to BAu Core Shed Site. 10 Jan 2022
JUDDH 90 at 137m. 9 Jan 2022
8 Jan 2022 NY BBQ
BBQ NY 8 Jan 2022
NY BBQ 8 Jan 2022
Charles entering 2021_22 data into Jugan Datamine 3D Model 6 Jan 2022
JUDDH89 @153m 6 Jan 2022
Photo Record JUDDH89-Nate 6 Jan 2022
Rig #1 on JUDDH89 6 Jan 2022
JUDDH89 6 Jan 2022
Rig #2 on JUDDH90 6 Jan 2022
Lacqered core drying before water displacement submersion for SG measurement. 5 JAn 2022
NBG Bau Office (rear) Core Shed (right) 5 Jan 2022.
NBG Bau Office (front). Drillcorp Yard (right-back) 5 Jan 2022
Lacquer Spraying core prior to water displacement SG measurement. 5 Jan 2022
Weighing Core in air before weighing water submersed for SG measurement. 5 JAn 2022
2 x Core Saws at NBG Core Shed 4 Jan 2022
Rig #2 on JUDDH90 4 Jan 2022
Rig # 2 on JUDDH 89 4 Jan 2022
Hand specimin from intrusive A12 Anomaly Jugan. 4 Jan 2022
Core Saw Station NBG Core Shack
Small sample drying oven and core cutter. 2 Jan 2022
JUDDH 90 & 89 in troorntial downpour. 2 Jan 2022
Rig#2 front, Rig #1 rear. Heavy Rains and lightning 2 Jan 2022
Drill Rig #2 at JUDDH 90 without rod guard screen. 31 Dec 2021
Drill Rig #1 at JUDDH 89 without rod guard screen. 31 dec 2021
JUDDH 89 Core at 96m 31 Dec 2021
JUDDH 89 Core at 95m 31 dec 2021
JUDDH89 Core at 90m 31 Dec 2021
Chief Geologist Nate-Field Quick Log JUDDH 89 Core 31 Dec 2021
JUDDH 89 (front) & 90 DD Holes 31 Dec 2021 31 Dec 2021
JUDDH90 (far) & 89 DD Holes 31 Dec 2021
Excavated borrow for drill pad repairs, 31 Dec 2021
JUDDH 90 Core at 63m 31 dec 2021
JUDDH 90 Core at 61m 31 Dec 2021
JUDDH90 30 Dec 2021
JUDDH89 30 dec 2021
JUDDH90 (3) 30 Dec 2021
Core-JUDDH 90 29 Dec 2021
Core from split tube JUDDH90 29 Dec 2021
JUDDH90 core from split tube 29 Dec 2021
JUDDH 89 29 Dec 2021
JUDDH89 Core from split tube 29 Dec 2021
JUDDH90 29 Dec 2021 (2)
Rig #2 JUDDH89 (2) 29 dec 2021
JUDDH89 (3) 29 dec 2021
Nate inspecting core at Rig #2-JUDDh89. 29 Dec 2021
JUDDH 89 Core inspection at Rig #1
Nate-Field Quick Log JUDDH90 29 Dec 2021
JUDDH90 Field Quick Log. 29 Dec 2021
Core JUDDH89 29 Dec 2021
Rig #2 JUDDH89 29 Dec 2021
JUDDH90 29 Dec 2021 (3)
JUDDH90(2) 29 Dec 2021
JUDDH90 29 Dec 2021
JUDDH89 Nate field quick log 28 Dec 2021
Nate deciding to terminate JUDDH85 29 Nov 2021
Nate checking core JUDDH85 29 Nov 2021
Nate checking core out the barrel JUDDH85 before termination hole. 29 Nov 2021
Core log data entry 29 Nov 2021
I love Bau 27 Nov 2021
Bau Town China Miners 27 Nov 2021
PQ & HQ Core Boxes 27Nov 2021
Drilling JUDDH84 27 Nov 2021
Core drill set up over JUDDH85 27 Nov 2021
Setting up rig JUDDH84 27 Nov 2021
Setting up drill JUDDH85 27 Nov 2021
Core shed frame delivery 27 Nov 2021
Core tray arrival NBG Office 27 Nov 2021
Relocating JUDDHX 26 Nov 2021
Tasik Biru Bau Sunset 25 Nov 2021
Meeting NBG-Pejiru-Bogag 23 Nov 2021
Pejiru-Bogog Committe 3 2021-11-23
Meeting NGB-Pejiru-Bogag leaders 23 Nov 2021
Core Saw temp location Drillcorp shop 22 Nov 2021
Core barrel cleanout JUDDH83 22 Nov 2021
Drilling JUDDH83 22 Nov 2021
JUDDH84 22 Nov 2021
Drill pad prep JUDDH84 22 Nov 2021
Dril pad JUDDH84 22 Nov 2021
Drill pad JUDDH84 prep 22 Nov 2021
JUDDH83 22 Nov 2021
Nate talking to driller JUDDH83 22 Nov 2021
Dilling JUDDH83. Pad prep JUDDh84 22 Nov 2021
Core Box Transport Cage JUDDH83 22 Nov 2021
Logging JUHHD82-21 Nov 2021
Core boxes JUDDH83 21 Nov 2021
JUDDH8X Drill Pad 21 Nov 2021
Drill Pad JUDDH8X 21 Nov 2021
Drill pad #11 on 20 Nov 2021(2)
Drill pad # 11 on 20 Nov 2021
Jugan drill access 20 Nov 2021
#2 Drill Rig (only rig) on second hole 20 Nov 2021
Jugan_drilling sequence
Core logging frame 19 Nov 2021
Geology Manager Nate seting the mast up vertical for the second Jugan Hole 19 Nov 2021
Mast up vertical for the second Jugan Hole
2nd Diamond Core Rig
0.607 ppm Au
8.595 ppm Au
4.134 ppm Au
1.027 ppm Au
Removing core from core barrel. 1st Jugan hole 18 Nov 2021
Core logging first Jugan sector hole 18 Nov 2021
Jugan first hole core laid out for logging 17
Setting up #2 drill on first Jugan hole. 17 Nov 2021
Jugan drill pad for hole 8 on 17 Nov 2021
Nate drill pad selection 17 Nov 2021
Core Jugan sector first hole 16 Nov 2021
Intrusive exposed at dril pad JUDDH85 16 Nov 2021
Preparing Jugan Drill pad # on 16 Nov 2021
Jugan drill pad # ready on 16 Nov 2021
Jugan Drill Pad number 7 ready on 16 Nov 2021
Drill access to pads number on 16 Nov 2021
First Jugan hole before the rains 16 Nov 2021
Collar 1st hole Jugan 15 Nov 2021
3 and 1 phase power line for core cutters and lighting 15 Nov 2021
Drill pad ready 14 Nov 2021
Core from 1st hole Jugan 14 Nov 2012 (colour from light shining through red tarpauline sun shade)
Retrieving core 1st hole Jugan 14 Nov 2021
Besra Exploration Office roof repair 14 Nov 2021
Rubi-land management assistant works tenements on Pejiru 14 Nov 2021
Core from Jugan forst hole 13 Nov 2021
Jugan sector drill pad preparation 13 Nov 2021
Drill pad ready 12 Nov 2021
Drill pad preparation Jugan 12 Nov 2021
New pump (black) installed 12 Nov 2021
Replacing pump at drill Jugan first hole 12 Nov 2021
Drill water supply 10 Nov 2021
Drill pad preparation 10 Nov 2021 (2)
Second Drill pad ready 10 Nov 2021
Drill pad preparation 10 Nov 2021
Diamond Core Dril loading for transport to Jugan Sector 8 Nov 2021
Diamond Core Drill #1 ready for Jugan 10 Nov 2021
Core boxes Drillcorp yard
Pad Ready
Road to pad at Jugan
Jugan rig preparation
Unloading the sled mounted drill rig at Jugan Deposit site in preparation for the commencement of drilling, Nov 8 2021.
Posting Lebih Baru
Beranda